944 S L4-2479cc 2.5L DOHC (1987)
5. Installed position of locks and 5th gear detent.
6. Installed position of gear detents (1st...4th gears).
7. Installed position of reverse gear detent.
Determining Thinkness of Shim "S4"
This procedure will be necessary after replacing the Gear carrier housing. It provides preload for the drive pinion's tapered roller bearings.