porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Drain/ Refill|Page 802 > < Drain/ Refill|Page 800
Page 3
background image

Note:  
^

The quantity of coolant available should exceed the amount required to fill the system by about two litres in order to prevent air being sucked
in.

^

An antifreeze content of -35°C corresponds to a mixture of 50:50 (antifreeze: water).

6. Place a canister with a sufficient amount of coolant and with an antifreeze content for -35° behind the vehicle near to the expansion tank

Note:  The bleeding process is completed more quickly if the canister is positioned at roughly the same height as the coolant expansion tank.

7. Push the filler hose of the vacuum pressure gauge-5- onto the canister connection. Draw off the return line-6- of the Venturi nozzle into a second

container.

Note:  A hissing sound after connecting the compressed air supply is usual.

8. Connect compressed air supply to Venturi nozzle

9. Open both shutoff valves on the vacuum pressure gauge until the transparent filler hose has completely filled with coolant.

Drain/ Refill|Page 802 > < Drain/ Refill|Page 800