porsche Workshop Repair Guides

Porsche Boxster S Workshop Service and Repair Manuals

Procedures|Page 5737 > < Procedures|Page 5735
Page 5
background image

13.1. Pull fold layer -27- out of the tension strap in -direction of arrow- on left and right.

14. Detaching convertible-top covering at the main and corner bows.

14.1. Pull the convertible-top covering from the groove of the main bow -29- and the cover strip -28-.

Installing the convertible-top covering

INFORMATION:

-

All pins and screw joints must be checked for tightness before the convertible-top covering is installed. Refer to Replacing convertible-top frame

-

If the convertible-top covering is very taut (with new convertible-top covering), close the convertible top and heat the convertible-top covering
evenly using a heating lamp.

-

Ensure that the convertible-top covering is not heated for longer than 1 hour.

-

Maintain a safe distance from the heating lamp of approx. 50 cm, then leave the vehicle overnight with the convertible top closed.

-

For the convertible top to close correctly it is essential that the convertible top gear is set at the basic adjustment. Refer to Adjusting convertible
top gear

1. Preparing convertible-top frame and convertible-top covering

1.1. Measure the centre between the restraining straps and mark it on the tension bow.
1.2. Replace the seals contained in the scope of parts on the left and right of the roof frame, and replace the centre cover moulding.
1.3. Replace the tension strap. Refer to Replacing convertible-top frame - for convertible top covering with glass window.

2. Installing the fold layer.

2.1. Insert fold layer -27- into the tension strap in -direction of arrow- on left and right. Make sure that the fold layer is routed above the push bar.

For an illustration of the push bar, refer to Procedure No. 10 Fastening holding strap of the convertible-top covering.

3. Clipping in fold layer

3.1. Press fold layer -27- into clips -26- in -direction of arrow-.

4. Pulling convertible-top covering in at the main bow

Procedures|Page 5737 > < Procedures|Page 5735