porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removing and Installing Closure Cap For Camshaft Bore - Engine Installed|Page 1218 > < Removing and Installing Closure Cap For Camshaft Bore - Engine Installed|Page 1216
Page 23
background image

3. Check camshaft adjustment at cylinder bank 4 - 6: The groove in the camshaft must face inward toward the crankcase.

4. Turn engine 90° counterclockwise on the assembly support. Cylinder bank 4 - 6 faces upward.

5. If the allocation is correct, the narrow segment must face the cylinder head cover on the opposite side of the cylinder head.

6. Fasten blocking device (special tool 9612) on the cylinder head (4 - 6).

7. Perform following assembly steps for timing adjustment as described from Step 7 to Step 11.

8. Fit oil extraction pumps

Note  The oil extraction pumps on the cylinder heads are identical parts. Therefore, the installation position and direction of rotation must be
correct.

Installation position of oil extraction pump at cylinder head 1 - 3 (flywheel side): The arrow for the direction of rotation or the marking "1 - 3"
must face the crankcase. Fit oil extraction pump. Use new sealing ring and new micro-encapsulated hexagon socket head screws. 
Tightening torque: 10 Nm (7.5 ft. lbs.) 

Removing and Installing Closure Cap For Camshaft Bore - Engine Installed|Page 1218 > < Removing and Installing Closure Cap For Camshaft Bore - Engine Installed|Page 1216