porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removal and Replacement|Page 4100 > < Removal and Replacement|Page 4098
Page 7
background image

1. Screw in fastening screws -1- laterally on the front apron -2- and tighten to the specified torque. Final tightening: 2.1 ftlb.

Locking hose for headlight cleaning system

INFORMATION:  Only for vehicles with headlight cleaning system.

1. Connect water feed line for headlight cleaning -1- -arrows-.

Removal and Replacement|Page 4100 > < Removal and Replacement|Page 4098