Boxster S (987) F6-3.4L (2008)
Install front impact pipe
1. Position the seal impact pipe -3- and impact pipe -2-.
2. Screw in fastening screws -1- and tighten to the required tightening torque. Final tightening: 17 ftlb.
Subsequent work
Install front bumper. Refer to Removing and installing front bumper
Installing front apron. Refer to Removing and installing front apron