porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 3086 > < Procedures|Page 3084
Page 83
background image

1. Lay out wire harness for engine.

2. Install centre cable duct.

2.1. Clip in cable duct -arrow- and secure with the fastening screws. - Tightening torque: 10 Nm (7.5 ft. lbs.)

3. Install cable duct at left and right.

3.1. Position cable duct left and right -Arrow A- and clip in -Arrow B-.
3.2. Secure cable duct left and right with fastening screw -Arrow C-. - Tightening torque: 10 Nm (7.5 ft. lbs.)

4. Clip in engine wire harness at the tie-wraps -57-.

4.1. Clip in tie-wrap at cable duct in area of grommet.
4.2. Clip in tie-wrap at the branch (throttle valve, secondary pump, coolant change-over valve).
4.3. Clip in tie-wrap on the secondary pump.

5. Push through engine wire harness in direction of luggage compartment and fit grommet -56-.

INFORMATION:  Only on the Cayman.

6. Clip in wire harness to Tiptronic control module and DME control module at the two holders in the area of the service flap.
7. Push on connector of Tiptronic control module -55- until it is felt to engage.
8. Push on connector of DME control module -52 to 54- until it is felt to engage.

9. Screw down ground strap -51-.

9.1. Fit ground strap and secure with fastening nut. - Tightening torque: 9 Nm (6.5 ft. lbs.)

Procedures|Page 3086 > < Procedures|Page 3084