porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Fusible Link > < Diagram Information and Instructions|Page 2682
Page 2
background image

1. Engage the fusebox on the support and secure with the fastening nut -1-. Ensure that the electrical lines are not trapped or installed live. -

Tightening torque: 9.7 Nm (7 ft. lbs.)

2. Insert the electrical connectors until they perceptibly engage.

Subsequent work

Subsequent work on fusebox

Install front left side section trim.

Fusible Link > < Diagram Information and Instructions|Page 2682