Cayenne GTS (9PA) V8-4.8L (2008)
4. Engage cover -Arrows A- and screw in fastening screws -Arrow B-. - Tightening torque: 1 ftlb.
Installing electric line for heater/air-conditioning unit
1. Route electric wiring harness from air distributor down along the-heater/air-conditioning unit.
2. Insert temperature sensor -H- into heating/air-conditioning unit and turn 90°.
3. Slide holder -G- for wiring harness onto heater/air-conditioning unit.
4. Slide holder -F- for wiring harness onto heater/air-conditioning unit.
5. Insert electric connector into servo motor -E- until it is felt to engage.