Cayenne GTS (9PA) V8-4.8L (2008)
22. Undo fastening nut -8- and remove line -Arrow A-.
23. Undo fastening nut -9- and remove line -Arrow B-.
24. Unscrew fastening nuts -10- and remove Tyco switch -Arrow C-.
25. Undo fastening nut -11- and remove line -Arrow A-.
26. Release fuse carrier -Arrow B- and remove it from brackets -Arrows C-.
27. Undo fastening nut -12- and remove line -Arrow A-.
28. Undo fastening nuts -13- and remove lines -Arrow B-.
29. Remove floor carpeting from the work area.
30. Cut open tie-wraps -C- and remove the wire harness -Arrows D-.
Installing central electrical system power distributor
INFORMATION: Always use new self-locking nuts to fasten the lines and retainers.
1. Place wire harness in the installation position -Arrows A-.
2. Place lines on the threaded bolts -Arrows B- and tighten using new fastening nuts -13- - Tightening torque: 4.5 ftlb.
3. Place line on threaded bolt -Arrow C- and tighten using a new fastening nut. -12- - Tightening torque: 3.5 ftlb.
4. Insert fuse carriers -Arrows A- until locking tabs -B- are felt to engage.
5. Fasten line with new tie-wraps -C-.