porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 3218 > < Procedures|Page 3216
Page 60
background image

3. Connect line (central electrical system power distributor) to threaded bolt -Arrow A- and tighten with the fastening nut. -2- - Tightening torque: 4.5

ftlb.

Only for vehicles with auxiliary battery

4. Connect line to threaded bolt -Arrow B- and tighten with the fastening nut. -3- - Tightening torque: 12 ftlb.
5. Close cap -Arrow C- until locking tabs -a- are felt to engage.
6. Push connector onto airbag sensor at B-pillar.

7. Clip in line -arrows- (lower B-pillar).

A-&amp; B-pillar

8. Push sockets into socket bracket -Arrows A- until locking tabs -B- are felt to engage.
9. Push in socket bracket -Arrow C- until locking tabs -D- are felt to engage.

A-&amp; B-pillar

10. Push in the connectors -Arrows A- until locking tabs -B- are felt to engage.
11. Push on wire sleeve -Arrow C- until locking tabs -D- are felt to engage.

Procedures|Page 3218 > < Procedures|Page 3216