porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Relays and Modules - Wheels and Tires > < Position of Air Suspension Components|Page 3631
Page 5
background image

9. Go to Control unit replacement and select the Write values menu. Then load the values that were read out and press >>.

10. Press F8 to start synchronizing the pressure sensors and then press >> to continue.

Warning
The vehicle begins to sway to the left and right at the start of the low-pressure and high-pressure check
^

Risk of squashing

^

Risk of damage to the vehicle

-> The vehicle must stand freely and must not be jacked up.
-> Make sure the vehicle is at least 80 cm away from people and objects at all sides.

11. Start the engine, follow the instructions on the PIWIS Tester 9718 and start the low-pressure check by pressing >>. Tester reports that the

low-pressure check was completed successfully. Press >>.

Information 
Set damper hardness to normal.

Set air-spring level to normal and switch it off.

12. With the engine running, follow the instructions on the PIWIS Tester 9718 and start the high-pressure check by pressing >>. Tester reports that the

high-pressure check was completed successfully. Press >>.

13. Read out the fault memory and erase it if necessary.
14. Carry out a test drive, then read out the fault memory and if there are faults present, correct them according to the Guided Fault Finding

instructions.

Relays and Modules - Wheels and Tires > < Position of Air Suspension Components|Page 3631