porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Body - Running Board Installation|Page 8422 > < Body - Running Board Installation|Page 8420
Page 8
background image

7.

Position rear holder and screw in the hexagon-head flat screws (A).

7.1

Align holder with template (see Step 4) and tighten the hexagon-head flat screws.

Tightening torque: 26 Nm (19 ftlb.)

8.

Attaching running board.

Note:

Raise or lower the vehicle to working height with the platform lift.

8.1

To ensure the correct seat of the sealing lip for the vehicle side member, place an electrical wire (2 m long / 1.0 sq.) behind the sealing lip on the
running board.

8.2

Position running board and tighten using the hexagon-head flat screws (A).

Tightening torque: 26 Nm (19 ftlb.)

8.3

Pull out the electrical wire carefully from the running board and check the correct seat of the sealing lip.

Body - Running Board Installation|Page 8422 > < Body - Running Board Installation|Page 8420