Cayenne S (9PA) V8-4.5L (2003)
2. Place intake-air distributor on the engine and tighten the screws in the sequence shown below. - Tightening sequence for suction module - Initial
tightening: 7.5 ftlb. - Final tightening: 11 ftlb.
3. Connect the 8 electric connectors to the injection valves. The connectors must engage audibly.
4. Install positive crankcase ventilation line. The 2 connections must audibly engage. Then close the mounting clip.
5. Install line between intake distributor and oil mist collector.
DANGER: Danger of poisoning from fuels.