porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Power Distribution Relay|Service and Repair|Page 6054 > < Power Distribution Relay|Service and Repair|Page 6052
Page 5
background image

6. Slide cover of current distributor from front to back and press on until clips lock in place.

7. Connect the negative cable "2". Refer to 'Tightening torques'

8. Replace the battery box cover carefully. The ventilation channel must be mounted properly.
9. Attach the four tension hooks in the battery case cover and close using the screwdriver.

10. Move the seat in its folded position towards the rear and then tip forward.
11. Screw in fastening screws "2". Refer to 'Tightening torques'
12. Clip in front seat trim "1".

Checking Cutoff Relay Operation

Power Distribution Relay|Service and Repair|Page 6054 > < Power Distribution Relay|Service and Repair|Page 6052