Cayenne S (9PA) V8-4.5L (2003)
6. Slide on all 8 electric connectors on the injection valves. The connectors must engage audibly.
7. Connect fuel line at the connection point on the plenum panel. The connector must engage audibly.
8. Switch on ignition and check the system for leaks.
9. Press the 4 rubber elements in the cover onto the 4 ball socket holders. The fastening elements must lock in firmly.
10. Slide the design cover of the cylinder bank 1 - 4 under the secondary air pump as shown in the picture and then slide the cover of the second
ignition coil through underneath the torque support bracket.