porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Intake Air Plenum|Testing and Inspection|Page 3791 > < Intake Air Plenum|Testing and Inspection|Page 3789
Page 11
background image

Stages

Tightening torque [Nm] (ftlb.)

10 (7.5)

II

15 (11.0)

3. Connect the 8 electric connectors to the injection valves. The connectors must engage audibly.

4. Install positive crankcase ventilation. The 2 connections must audibly engage. Then close the mounting clip.

5. Install line between intake distributor and oil mist collector.

Intake Air Plenum|Testing and Inspection|Page 3791 > < Intake Air Plenum|Testing and Inspection|Page 3789