porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 5725 > < Diagram Information and Instructions|Page 5723
Page 4
background image

5. Screw on the coolant connection at the front on the three-phase generator.

6. Connect the coolant lines and position the holding clamps.
7. Screw ground lead -3- onto the three-phase generator.

8. Attach the clip -4- on the electrical lead to the three-phase generator.
9. Position the impact bracket and screw tight with the fastening screws -8-.

-

Top up coolant.

-

Install right air-cleaner box.

-

Install the right wheel housing liner.

-

Connect the battery and carry out the work instructions.

-

Install underbody sealing for the engine.

Tightening torques

Diagram Information and Instructions|Page 5725 > < Diagram Information and Instructions|Page 5723