porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Power Distribution Relay|Service and Repair|Page 5816 > < Power Distribution Relay|Service and Repair|Page 5814
Page 4
background image

1. Lay lead under the positive cables and position cutoff relay in the current distributor.

2. Screw both fastening nuts on the cutoff relay and tighten. Refer to 'Tightening torques'

NOTE:  Use new nuts.

3. Fix lead for cutoff relay with three tie-wraps.

4. Make the plug connection, until plug is felt to engage.
5. Engage plug connection in current distributor box.

Power Distribution Relay|Service and Repair|Page 5816 > < Power Distribution Relay|Service and Repair|Page 5814