Cayenne Turbo (9PA) V8-4.8L Turbo (2008)
Installing Circulating Pump For Auxiliary Heater
1. Install circulating pump for auxiliary heater.
1.1. Place circulating pump for auxiliary heater -3- in installation position -arrow A-.
1.2. Close clamp -2- ( -arrow B- ) and screw down using the fastening screw -1-.
INFORMATION: Before connecting the water hoses, apply suitable rubber lubricant to the flanges.
1.3. Slide water hoses onto the circulating pump -arrows C-.
1.4. Slide spring band clamps onto the connections using the assembly pliers for spring band clamps, Cayenne hose connections NR.72-1 (
-arrows D- ) and align with the markings.
1.5. Slacken spring band clamps -arrows E- and secure the hoses.
2. Connect the water tube to the threaded bolt -arrow- and secure with the fastening nut -1-. - Tightening torque: 6 Nm (4.5 ftlb.)
3. Connect plug connection for circulating pump.
3.1. Push the plug connection -arrow A- together until it engages securely.
3.2. Push plug connection onto holder -arrow B-.
3.3. Insert line into the line bracket -arrow C- and close line bracket -arrow D-.
4. Unscrew the hose clamp 3094 and remove it.
Subsequent Work
1. Fill in coolant and bleed cooling system.
2. Install front left wheel housing liner.
3. Installing front left wheel.