Cayenne Turbo (9PA) V8-4.8L Turbo (2008)
6.3. Tighten fastening nuts -1-. - Tightening torque: 6 Nm (4.5 ftlb.)
7. Position water tube on holder and secure with a blind rivet -1- (4.8 x 10).
8. Push water tube holder -1- onto the two water tubes and screw down using the fastening screw -2-. - Tightening torque: 3 Nm (2 ftlb.)
9. Plug connector onto the directional-control valve -arrow- until the connector engages securely.
Subsequent Work
1. Install intake muffler with intake manifold.
2. Install complete heater.