porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 4037 > < Procedures|Page 4035
Page 7
background image

29. Route wire harness -1- under the hydraulic unit.

30. Mount ground strap together with the twist lock on the stud and screw down with the fastening nut -1-. - Tightening torque: 6.5 ftlb.

31. Push the plug connection for the bonnet wire harness together -arrow A- until it is felt to engage.
32. Push the plug connection for the bonnet wire harness onto the retaining clips -arrow B- until it is felt to engage.

Installing Intake Pipe On The Heating/Fresh Air Unit

1. Position intake manifold and secure with both fastening nuts -1-. - Tightening torque : 4.5 ftlb.
2. Close both retaining clips in the intake manifold -arrow A-.
3. Insert air inlet grille -arrow B-.
4. Clip in wire harness to intake manifold -arrow C- and insert wire harness retaining clips on intake manifold -arrow D-.

Installing Support For DME Control Module

Procedures|Page 4037 > < Procedures|Page 4035