porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removal and Replacement|Page 973 > < Removal and Replacement|Page 971
Page 21
background image

Fastening central screw of camshaft adjusting device.

Information
^

Before final tightening (torque angle) of the central screw, the special tool adjusting gauge 9686 must be removed.

10. Remove special tool adjusting gauge 9686. Undo the M8 screw and remove gauge.
11. Tighten central screw using torque angle wrench. -> Final tightening torque angle: 110°

Adjust timing, cylinder bank 1-3:

Information
^

Before final tightening (torque angle) of the central screw, the special tool adjusting gauge 9686 must be removed.

12. Final timing adjustment for cylinder bank 1-3 is analogous to that for cylinder bank 4-6.
13. Fit chain tensioner for side 1-3 (hexagon a/f 32) before turning crankshaft to the TDC mark. Fit chain tensioner with new sealing ring and tighten.

-> Tightening torque: 80 Nm (59 ftlb.)

Chain tensioner, cylinders 1 - 3

After adjusting the timing, this should be re-checked.

14. Turn the engine two complete turns (720°) at the crankshaft pulley and fix at the TDC mark. Check camshaft position of cylinder bank 1-3 using

the adjusting gauge 9686. Then turn a further 360° and check the camshaft position of cylinder bank 4-6.

Removal and Replacement|Page 973 > < Removal and Replacement|Page 971