porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Air Injection Hose/Tube|Service and Repair|Page 1889 > < Air Injection Hose/Tube|Service and Repair|Page 1887
Page 6
background image

Special tool 9821: - Tightening torque: 30 Nm (22 ftlb.)

Installing secondary-air line for cylinder bank 4-6

1. Position secondary-air line.

2. Guide secondary-air line -1- into the connection in the cylinder head.

3. Fit cap screw (a/f 27) -1- for the secondary-air line at the shut-off valve.

4. Fit and tighten external Torx screw (E10, M6 x 25) -2- on the secondary-air line -1- at the crankcase. - Tightening torque: 10 Nm (7.5 ftlb.)

Air Injection Hose/Tube|Service and Repair|Page 1889 > < Air Injection Hose/Tube|Service and Repair|Page 1887