Cayman (987) F6-2.9L (2009)
9. Fit coolant hoses at the oil/water heat exchanger.
9.1. Remove stoppers from the connections at the oil/water heat exchanger and coolant hoses.
9.2. Push on coolant hoses.
9.3. Position and secure spring band clamps -1-.
9.4. Remove hose clamps.
9.5. Remove cleaning cloths.
Subsequent work
Only for installing secondary-air line for cylinder bank 4-6:
1. Install oil filler neck.
2. Install intake-air distributor for cylinder bank 1-3.
3. Install resonance tube.
4. Install rear wheel housing liner.
5. Check engine coolant level and top up coolant if necessary.
6. Install engine compartment lid.
7. Connect negative terminal of the battery.