porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removal and Replacement|Page 1021 > < Removal and Replacement|Page 1019
Page 1
background image

Camshaft: Overhaul

Removing and installing camshafts

Preliminary work

1. Remove valve cover. Disassemble the cross panel to do this.
2. Remove camshaft controller.
3. Remove camshaft timing gears.
4. The high-pressure pump must be removed first before the intake camshaft for cylinder bank 5 to 8 can be removed. The drive coupling of the

high-pressure pump prevents the camshaft from being removed.

Removing camshafts

Information
*

During removal, note the installation position and allocation of the camshafts and bearing covers on a sheet of paper in such a way that they cannot
be mixed up.

*

Protect camshafts and bearing covers from dirt and place the components on a clean surface according to installation position.

1. Slowly and uniformly loosen and unscrew all M6 screws (according to cylinder bank) -1 and 6- -3 and 5- on the camshaft bearing covers -2, 4 and

5- -2, 4 and 6-.

The bearing covers are marked E for intake camshaft and A for outlet camshaft. The bearing covers are numbered consecutively by cylinder.

The bearing covers are seated very securely in the cylinder head because of a dowel sleeve -3- -1-. Jiggle free using a pliers if necessary. Place on
a marked, clean surface.

Camshaft mount, cylinder bank 1 to 4

Camshaft mount, cylinder bank 5 to 8

Information
*

The intake camshaft for cylinder bank 5 to 8 has a plastic loss preventer to prevent the high-pressure pump's drive coupling from falling off.

*

If for some reason the plastic loss preventer was not installed, the drive coupling would fall off when the camshaft is removed. The high-pressure

Removal and Replacement|Page 1021 > < Removal and Replacement|Page 1019