Panamera S (970) V8-4.8L (2010)
3. Remove air boxes on both sides.
3.1. Remove screws on the hose clamps at the air-cleaner box -A- and intake manifold -B-.
3.2. Pull off and remove air boxes on the air-cleaner box and intake manifold.
4. Removing upper pressure pipes
4.1. Remove screws on the hose clamps at the throttle valve air box -A- at both sides.
4.2. Remove tension locks on the charge air cooler -B- on both sides.
4.3. Remove pressure pipes.
Installing pressure pipes
1. Fit upper pressure pipes
1.1. Insert pressure pipes and make sure that the tension locks -B- engage securely on the charge air cooler.
1.2. Fit screws on hose clamps -A- at the throttle valve air box at both sides.
2. Fit air boxes on both sides.
2.1. Fit air boxes on the air-cleaner box and intake manifold.
2.2. Screw in screws on the hose clamps at the air-cleaner box -A- and intake manifold -B-.
3. Raise the vehicle.
4. Fit pressure pipes on the turbocharger and charge air cooler -A and B- and make sure that the tension locks engage securely.