saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 10473 > < Diagram Information and Instructions|Page 10471
Page 16
background image

1. Make sure the component or lead to be tested is not under tension (e.g. by removing the relevant fuse).
2. Set the multimeter for measuring ohms and connect the ohmmeter to each end of the component/lead to be tested.
3. Jiggle the relevant wiring harness while observing the ohmmeter.

Normally, the resistance of a wiring harness is less than 1 ohm. Specified values apply to components.

Testing for short circuits to ground

1. Make sure the lead being tested is not under tension (e.g. remove the relevant fuse) and that any loads are disconnected.
2. Set the multimeter for measuring ohms.

Diagram Information and Instructions|Page 10473 > < Diagram Information and Instructions|Page 10471