9-3 (9440) L4-2.0L Turbo (2007)
25. Move up the wiring.
To fit
1. Position the new wiring in the engine bay and bring down the part to be connected to the control module.
2. Route the power steering pump wiring between the engine and power steering hose. Fit the clip and plug in the connectors (A) of the power
steering pump.
3. Attach the electrical connections (A) to the generator.