saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Complete Side, Soft Top Mechanism|Page 9467 > < Complete Side, Soft Top Mechanism|Page 9465
Page 36
background image

4. Pop rivet the base.
5. Fit new double-backed tape on the third bow. Stretch the outer roof fabric towards the third bow and fold the fabric edge around the bow. Fit the

plastic retainer for the headlining in the third bow. Make sure that the headlining and outer roof midlines are directly lined up.

6. Fit the new double-backed tape on the second bow. Stretch the outer roof fabric towards the second bow and fold the fabric edge around the bow.
7. Fit the plastic retainer for the headlining in the second bow. Make sure that the centre lines of the headlining and the outer roof are aligned. Press

on the plastic clip.

8. Pop rivet the side cables.

Complete Side, Soft Top Mechanism|Page 9467 > < Complete Side, Soft Top Mechanism|Page 9465