9-3 Viggen Coupe (9400) L4-2.3L Turbo (B235) HO (1999)
7. Cut the 2 cable ties securing the main engine cables. Relieve the strain on the belt tensioner with a ratchet handle and secure the belt tensioner with
a 3.5 mm drill or similar.
8. Lift the belt off the power steering pump and coolant pump pulleys.