9-5 (9600) L4-2.3L Turbo (B235) (2001)
1. Position the high-pressure pipe in the engine bay.
NOTE: Insert the high-pressure pipe in the engine bay from the left side.
2. Remove the plugs. Replace and lubricate the O-rings on the receiver connection.
3. Press in the high-pressure pipe to the holder on the subframe.
4. Screw on the PAD connection to the receiver.
Tightening Torque: 8 Nm (5.9 ft. lbs.)
5. Remove the plugs. Replace and lubricate the O-ring on the compressor connection.
6. Adjust the oil level in the compressor.
Press on the PAD connection to the compressor and tighten.