saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Relays and Modules - Lighting and Horns > < Diagram Information and Instructions|Page 747
Page 10
background image

1. Make sure the lead being tested is not carrying a current (e.g. by removing the associated fuse) and that any load has been disengaged.
2. Set the multimeter to resistance measurement.
3. Connect one test cable to a good ground and the other to the point to be tested.
4. Carefully move the wiring harness and make sure the multimeter shows infinite resistance (OL) the whole time.

Relays and Modules - Lighting and Horns > < Diagram Information and Instructions|Page 747