9-5 Aero (9600) L4-2.3L Turbo (B235) HO (2000)
10.
Press down the control rod to its lowest position.
Tightening torque 1.4 Nm (1 lbf-ft).
11.
Locate the air distributor housing into it's position and fit the screws.
12.
Fit the upper section of the new control rod in its clip.
13.
Wind up the linkage to the stepping motor in the air distributor housing to the upper stop.
14.
Fit the stepping motor and it's 2 screws on the air distributor housing.
15.
Locate the fan housing into its position and fit the screws to the cabin fan housing and fit the 2 clips.