2003 9-5 Sport Wagon L4-23L Turbo HVAC Housing Assembly Technical Service Bulletins
10. Fit the solenoid valve and holder to the bulkhead as follows:
-
Plug in the connector to the charge air bypass valve solenoid valve and screw it to the holder, 1 bolt.
-
Fit the holder and connector to the bulkhead, 2 bolts.
-
Fit the cover on the solenoid valve.
11. Fit the pipe from the charge air cooler to the throttle body.