9-7X L6-4.2L (2008)
![background image](/saab/9-7x/l6-4.2l/Page-1328002.png)
6. Remove the 1-2 and 2-3 shift solenoid retainers.
7. Remove the 1-2 and 2-3 shift solenoids.
8. Remove the 3-2 control solenoid retainer.
9. Remove the 3-2 control solenoid.
Installation Procedure
1. Install the 3-2 control solenoid.
2. Install the 3-2 control solenoid retainer.
3. Install the 1-2 and 2-3 shift solenoids.
4. Install the 1-2 and 2-3 shift solenoid retainers.