9000 CSE V6-2962cc 3.0L DOHC (B308) (1996)
Installation
1. Install the throttle cam with shaft, hook in the spring as illustrated.
2. Install the complete unit.
3. Install the clip and tighten with a screw.
-
Screw size = TORX TX 27
Tightening torque: 10 Nm (6.3-7.7 ft. lbs.)
4. Apply grease Vaseline to the kick-down cable O-ring and push in the kick-down cable to its stop in the housing.
5. Tension the throttle cam one turn against spring force and hook on the kick-down cable nipple.
6. Valve body (10 screws, TORX 27).