saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 12010 > < Diagram Information and Instructions|Page 12008
Page 3
background image

Grounding Points

G34P

Grounding point, control module bracket (Power) below the right-hand A pillar.

DESCRIPTION OF OPERATION

When lights switch 10 is in position 0, current from the +54 circuit is supplied to the glove box.

 

When the lights switch is in position 1, current from the +30 circuit is supplied to the glove box.

 

When the lights switch is in position 2, current from the +X circuit is supplied to the glove box.

Current is supplied to the switch in the glove box via fuse 29.

When the glove box lid is opened, the switch closes the circuit to ground and lamp 19 comes on.

FAULT DIAGNOSIS HINTS

1. Check that fuse 29 is intact and supplied with current.
2. Check whether the light bulb is OK.
3. Check the connectors, wiring and ground connections.

Diagram Information and Instructions|Page 12010 > < Diagram Information and Instructions|Page 12008