ION L4-2.2L VIN F (2004)
Important: Verify the location of the front rail using 3-dimensional measuring equipment.
3. Position the impact bar bracket on the rail and clamp in place.
4. Plug weld accordingly.
5. Clean and prepare all of the welded surfaces.
6. Install all of the related panels and components.
7. Apply the sealers and anti-corrosion materials to the repair area, as necessary. Refer to Anti-Corrosion Treatment and Repair () in Paint and
Coatings.
8. Paint the repaired area. Refer to Basecoat/Clearcoat Paint Systems (See: Paint, Striping and Decals/Paint/Application and ID/Basecoat/Clearcoat
Paint Systems) in Paint and Coatings.
9. Connect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure in Engine Electrical.
10. Enable the SIR system. Refer to SIR Disabling and Enabling Zones in SIR.