L200 L4-2.2L VIN F (2002)
![background image](/saturn/l200/l4-2.2l_vin_f/Page-1843008.png)
1. Rotate temperature knob to full hot position.
2. Install cable eyelet onto control head pin and install cable housing flag into slot in control bead until it engages locking tab.
3. Install electrical connectors to control head.
4. Install control bead to I/P screws.
Torque:
Control Head to I/P Screws: 2.5 N.m (22 in-lbs)