L200 L4-2.2L VIN F (2002)
9. Install wire harness channel.
10. Install HVAC duct work.
11. Install left lower I/P closeout panel (hush panel).
9. Install wire harness channel.
10. Install HVAC duct work.
11. Install left lower I/P closeout panel (hush panel).