VUE FWD L4-2.4L Hybrid (2007)
24. Connect the engine wiring harness electrical connector (1) to the ECT sensor.
25. Install the HO2S electrical connector rosebud clip to the thermostat housing.
26. Install the battery tray.
27. Verify the drain valves at the radiator and water pump are closed.
28. Lower the vehicle.
29. Fill the cooling system.