VUE FWD L4-2.4L Hybrid (2007)
9. Connect the engine wiring harness electrical connector (1) to the generator control module coolant pump.
10. Lower the vehicle.
11. Using the engine support fixture, lower the engine.
12. Place the engine mount onto the side rail studs.
13. Install the engine mount to side rail nuts (1).
Tighten the nuts to 100 N.m (74 lb ft).
14. Install engine mount to bracket bolts (2).
15. Tighten the engine mount to bracket bolts in the following sequence.
1. Middle
2. Rear
3. Front
Tighten the bolts to 50 N.m (37 lb ft).