VUE FWD L4-2.4L Hybrid (2007)
5. Position the starter/generator to the bracket.
6. Install the starter/generator bolts until snug.
7. Tighten the starter generator bolts in the following sequence.
1. Front
2. Bottom
Tighten the bolts to 58 N.m (43 lb ft).
8. Install the 3-phase voltage cable bracket to the tie bar.
9. Install the 3-phase voltage cable bracket bolt at the tie bar.
Tighten the bolt to 10 N.m (89 lb in).