VUE FWD L4-2.4L Hybrid (2007)
4. Install the generator battery cables (1-4) to the batteries.
5. Install the generator battery nuts (1-4) to the battery cables.
Tighten the nuts to 8 N.m (71 lb in).
6. Install the generator battery temperature sensor wiring harness.