VUE FWD L4-2.4L Hybrid (2007)
1. Measure from each phase 1, 2, and 3 connection (1) to ground (2). The voltage should be less than 3 volts.
2. After verifying that there is no voltage present, the 12-volt and 36-volt positive battery cables can now be removed from the generator control
module.
9. Remove the 12-volt positive battery cable nut (1) from the generator control module.
10. Remove the 12-volt positive battery cable bolt (2) from the generator control module.
11. Remove the 12-volt positive battery cable from the generator control module.
12. Remove the 36-volt positive battery cable nut from the generator control module.
13. Remove the 36-volt terminal block nuts from the generator control module.
14. Lift up, and remove the 36-volt terminal block position the block out of the way. Discard the terminal block seal.