VUE FWD L4-2.4L Hybrid (2007)
Important: Ensure that the engine harness terminal (4) is still installed on the starter solenoid.
4. Install the positive battery cable (1) to the starter solenoid.
5. Install the positive battery cable nut (4) to the starter solenoid.
Tighten the nut to 10 N.m (89 lb in).
6. Connect the engine wiring harness electrical connector (1) to the CKP sensor.
7. Install the oil level indicator tube.