VUE FWD L4-2.4L Hybrid (2007)
1. Install the EVAP vent solenoid by gently turning the solenoid clockwise until it clicks into position.
2. Connect the EVAP vent solenoid electrical connector.
Notice: Refer to Fastener Notice.
3. Install the EVAP canister bracket-to-underbody fasteners.
Tighten the nuts to 8 N.m (71 lb in).
4. Lower the vehicle from the hoist.