VUE FWD L4-2.4L Hybrid (2007)
![background image](/saturn/vue_fwd/l4-2.4l_hybrid/Page-1406005.png)
Important: The secondary clip is not required for service. Make sure the shiftier cable is fully engaged into the shiftier control.
7. Connect the control cable to the control assembly. Secure with a new control cable retainer clip.
8. Install the control cable onto the control assembly lever.
9. Adjust the control cable assembly.
10. Install the right and left console trim panels.
11. Install the battery tray bracket.
12. Install the battery.