tC L4-2.4L (2AZ-FE) (2005)
G. Repeat steps 9B through 9F until the marking on the core drill is aligned with the top surface of the drill bushing.
10. Tap the bolt hole.
A. Position the cylinder block vertically.
G. Repeat steps 9B through 9F until the marking on the core drill is aligned with the top surface of the drill bushing.
10. Tap the bolt hole.
A. Position the cylinder block vertically.